DYCON: Structural Enhancement of NASSCO Berths III & IV, San Diego, USA

Market Sector: Waterfront Structures

Technology: The Tyfo Fibrwrap System

Country: USA

Structural Enhancement of NASSCO Berths III & IV, San Diego, USA

Project: Structural Enhancement of NASSCO Berths III & IV
Location: San Diego, USA
Client: General Dynamics NASSCO
Contract Duration: 10 weeks

Scope of Works:
• Shear and Flexural enhancement of beams to accommodate new increased service loads
• Repair of concrete piles of piers

 

Project Description:
Fibrwrap Construction Inc. provided a design-build proposal based on the engineer’s performance requirements. This was for a 50ton rated pier to be able to sustain a fully operational 90 ton gantry crane.
Beams and piles of the pier were enhanced and repaired with the use of the Tyfo® SEH-51A Glass Fiber with the use of the Tyfo® SW-1 epoxy, specially developed for underwater curing.
The full scope of the project was successfully completed in 12 weeks.
The Tyfo® SW-1 epoxy was also used as a finish coat on the beams in order to protect them from the rising tides.